- Demolition works on all floors internally
- Demolition of the existing flat roof
- Press mouldings to be taken of the existing Hall cornice detailing
- Careful removal of the Hall ceiling
- Banner installation, above Church Court Archway (09/11)
- Forming new structural openings and installing temporary works supports on all floors
- Enabling works for the crane on the South terrace
- Internal scaffold crash deck within library to facilitate roof demolition
- Demolition of existing slab and adjacent walls to facilitate the formation of a new lift pit in the north façade lightwell
- Concrete work to support the new steel roof structure
Construction Works 11 November to 25 November
11 November to 25 November


Removal of the Existing Flat Roof


Existing North Lightwell Stairs Removal
Construction Noise
Location | Description of the Works | Noise Level |
---|---|---|
Roof – Flat Roof - 11-25 November 2019 |
|
Amber |
Ground Floor – North Facade - 11-25 November 2019 |
|
Amber |
Basement – Lightwell - 11-25 November 2019 |
|
Red |
Mitigation Measures
- Installation of Noise Reducing Acoustic Blankets:
- At door openings
- At all windows locations
- Above the works in the lightwell
- Works to be undertaken during Noisy Hours only
- Hand tools will be used to demolish the walls, as far as reasonably
practicable.


Affected Work Areas
We're Building Something New
Please take a look at this short video to hear the rationale behind the project and see some of its design features
play_arrow
pause
0:00
-0:00
volume_up
volume_down
volume_off
zoom_out_map
Contact Us
SRM Special Projects Site Team offices are located within the Inn’s former Treasury Office, with access from the South Terrace where Reception Entrance signage can be found on the hoarding to assist. Please press the bell to attract attention.
Site working hours will be from:
8.00am - 6.00pm Monday-Friday
9.00am - 2.00pm Saturday

John Walker
Project Manager, SRM Special Projects
Detailsnavigate_next
John Walker
Project Manager, SRM Special Projects

John Walker
Project Manager, SRM Special Projects
Detailsnavigate_next
John Walker
Project Manager, SRM Special Projects

John Walker
Project Manager, SRM Special Projects
Detailsnavigate_next
John Walker
Project Manager, SRM Special Projects
Address
The Honourable Society of the Inner Temple
Treasury Office,
London EC4Y 7HL